Permit Library › Other GTA municipalities › Town of Halton Hills › Building permits (Building Services)

Designated Structure Permit: Retaining Wall, Shoring, Crane Runway or Solar Panels (Halton Hills)

Building permit from Halton Hills Building Services for a retaining wall, shoring, a crane runway or a solar or wind installation, each priced in the 2026 Building Permit Fees [haltonhills.ca].

You need it when: You build a retaining wall, shoring, a crane runway, or a solar or wind installation in Halton Hills.

Why is it needed?

When should you apply?

How long does review take?

Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]

What documents does a complete application need?

How do you submit it?

What are the fees?

Retaining walls, shoring, crane runways and solar or wind installations each have their own fee in the 2026 Building Permit Fees [haltonhills.ca]. The 2026 minimum permit fee is $263.37 for small residential and $344.23 for other work, and it covers plans review and 2 inspections (2026 Building Permit Fees) [haltonhills.ca].

Forms and guides

Official pages

Track Designated Structure Permit: Retaining Wall, Shoring, Crane Runway or Solar Panels (Halton Hills) free.
Start with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Track this permit free

Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.