Permit Library › Other GTA municipalities › Town of Georgina › Building permits (Building Division)
Pool Enclosure Permit (Georgina)
A Pool Enclosure Permit from the Georgina Building Division for the fence around a private outdoor pool, under Building By-law 2026-0058 (BU-1) [georgina.ca].
You need it when: You put in a private outdoor pool in Georgina that can hold water at least 60 cm (24 in) deep.
Why is it needed?
- All private outdoor pools that can hold water at least 60 cm (24 in) deep need an enclosure and a Pool Enclosure Permit [georgina.ca].
- The enclosure must be at least 1.2 m high and non-climbable, and a fence may be no more than 2.0 m high [georgina.ca].
- Hot tubs with a locking cover that holds 27.2 kg are exempt [georgina.ca].
When should you apply?
- All in-ground pools also need a Site Alteration and Entrance Permit, and the Town says that approval is needed before building permit issuance [georgina.ca].
- The enclosure must be inspected before the pool is filled [georgina.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- Swimming Pool Enclosures checklist and guide, 2026 [georgina.ca]
- For an in-ground pool, a Site Alteration and Entrance Permit with a lot grading plan by a P.Eng., Civil Engineering Technologist or Ontario Land Surveyor [georgina.ca]
- Letter of Authorization, if the applicant is not the owner [georgina.ca]
- Unsecured PDF files flattened to a single layer [georgina.ca]
How do you submit it?
- Apply online for the Swimming Pool Enclosure permit, and for an in-ground pool the Swimming Pool Site Alteration permit, through the Town's portal at georgina.my.site.com [georgina.ca].
- Building Division: building@georgina.ca, 905-476-4301 ext. 3007 [georgina.ca].
What are the fees?
2026 fee: $184.00 flat rate for a Pool Enclosure Permit (Development Services Fees By-law 2026-0057) [georgina.ca]. Site alteration fees are separate, at $180 plus a $1,000 refundable security deposit for an in-ground pool [georgina.ca]. Online card payments carry a charge of 2.9 percent plus 30 cents per transaction [georgina.ca].
Forms and guides
- Georgina Building By-law 2026-0058 (BU-1) (Town of Georgina, by-law)
- Georgina Development Services Fees By-law 2026-0057 (AD-5) (Town of Georgina, fee schedule)
- Georgina Swimming Pool Enclosures Checklist and Guide (2026) (Town of Georgina, checklist)
Official pages
- Building permits information
- Swimming pool enclosures checklist and guide, 2026 (PDF)
- Building permit application portal
Track Pool Enclosure Permit (Georgina) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.