Permit Library › Other GTA municipalities › Town of Georgina › Building permits (Building Division)
Mechanical (HVAC) Permit (Georgina)
Building permit under Georgina Building By-law 2026-0058 (BU-1) for HVAC work, woodstoves, fireplaces, chimneys, vented exhausts and commercial hoods [georgina.ca].
You need it when: You install or replace heating, ventilation or air conditioning, a woodstove, fireplace, chimney or vented exhaust in Georgina.
Why is it needed?
- Plumbing and HVAC work need a building permit [georgina.ca].
- A permit is also needed for fireplaces, woodstoves, chimneys and vented exhausts [georgina.ca].
- Electrical work goes to the Electrical Safety Authority, not the Town [georgina.ca].
When should you apply?
- For an addition or renovation that increases floor area by 15% or more, include a heat loss design [georgina.ca].
- HVAC, fireplaces, woodstoves and chimneys, and commercial exhaust hoods and dust collection are required inspection stages [georgina.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (2026) and Schedule 1 Designer Information [georgina.ca]
- Floor plans and HVAC drawings [georgina.ca]
- Heat loss calculations [georgina.ca]
- Mechanical ventilation summary [georgina.ca]
- Energy Efficiency Design Summary [georgina.ca]
How do you submit it?
- Apply through the Building Permit Application Portal at georgina.my.site.com, with every document as an unsecured PDF flattened to a single layer [georgina.ca].
- Building Division: building@georgina.ca, 905-476-4301 ext. 3007 [georgina.ca].
What are the fees?
2026 fees (Development Services Fees By-law 2026-0057, effective July 1, 2026): HVAC replacement $357.00, solid fuel appliance $456.00, commercial hood, dust collection or spray booth $636.00 [georgina.ca].
Forms and guides
- Georgina Building By-law 2026-0058 (BU-1) (Town of Georgina, by-law)
- Georgina Development Services Fees By-law 2026-0057 (AD-5) (Town of Georgina, fee schedule)
- Georgina Application for a Permit to Construct or Demolish (2026) (Town of Georgina, application form)
- Georgina Schedule 1: Designer Information (Town of Georgina, application form)
Official pages
- Building permits information (plumbing and HVAC)
- Energy Efficiency Design Summary form
- Fees By-law 2026-0057
Track Mechanical (HVAC) Permit (Georgina) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.