Entrance Permit: New or Modified Driveway Entrance (Georgina)
Entrance permit under Entrance By-law 2023-0019 (PWO-2), applied for through the Site Alteration and Entrance Permit with Development Engineering [georgina.ca].
Why is it needed?
- A new or modified driveway entrance, removing an entrance, or other work in the municipal right-of-way needs the Site Alteration and Entrance Permit [georgina.ca].
- Entrances are designed to the Town's GR-8 Urban Entrance or GR-9 Rural Entrance detail [georgina.ca].
- An entrance onto a Regional road needs a York Region entrance permit instead [georgina.ca].
When should you apply?
- A Road Occupancy Permit is also required for all entrance work, paving permits and other work on the Town's right-of-way [georgina.ca].
- Paving an existing entrance only uses the separate Paving Permit Application [georgina.ca].
- A new house needs its Site Alteration and Entrance Permit before the building permit is issued [georgina.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- Online application at georgina.my.site.com [georgina.ca]
- Entrance design to the GR-8 Urban or GR-9 Rural Entrance detail [georgina.ca]
- Mandatory SAEP drawing checklist [georgina.ca]
- Road Occupancy Permit form [georgina.ca]
How do you submit it?
- Apply online through the Town portal at georgina.my.site.com as part of the Site Alteration and Entrance Permit [georgina.ca].
- Send the Road Occupancy Permit to roadsadmin@georgina.ca, and apply to York Region for an entrance on a Regional road [georgina.ca].
What are the fees?
2026 fee listed on the Town's SAEP page: $500 fee + $2,500 refundable security deposit for a new or modified driveway entrance, removing an entrance or other work in the municipal right-of-way, with a $250 extension (Development Services Fees By-law 2026-0057 (AD-5), effective July 1, 2026) [georgina.ca]. The deposit is returned when the work is finished to the approved drawings [georgina.ca].
Forms and guides
- Georgina Development Services Fees By-law 2026-0057 (AD-5) (Town of Georgina, fee schedule)
- Georgina Site Alteration By-law 2026-0060 (REG-1) (Town of Georgina, by-law)
- Georgina Site Alteration and Entrance Permit Drawing Checklist (Town of Georgina, checklist)
Official pages
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.