Permit Library › Other GTA municipalities › Town of Georgina › Building permits (Building Division)
Building Permit: Sign Structure Regulated by the Building Code (Georgina)
Building permit under Georgina Building By-law 2026-0058 (BU-1) to build or materially alter a sign, separate from the Sign By-law 2006-0062 permit [georgina.ca].
You need it when: You build or materially alter a sign structure in Georgina.
Why is it needed?
- The Town lists construction or material alteration of a sign as work that needs a building permit [georgina.ca].
- Under Sign By-law 2006-0062 (PUT-1), no sign may be erected, displayed, repaired, replaced or altered without first getting a sign permit from Municipal Law Enforcement [georgina.ca].
- Signs on public property are prohibited [georgina.ca].
When should you apply?
- Check zoning before applying for the building permit [georgina.ca].
- The Sign By-law permit must be in place before the sign is erected or altered [georgina.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (2026) and Schedule 1 Designer Information [georgina.ca]
- Sign construction drawings and specifications [georgina.ca]
- Metric survey or site plan [georgina.ca]
- Application for Sign Permit and owner authorization form [georgina.ca]
How do you submit it?
- Apply for the building permit through the Building Permit Application Portal at georgina.my.site.com [georgina.ca].
- Email the Sign By-law permit application to bylaws@georgina.ca for Municipal Law Enforcement review [georgina.ca].
What are the fees?
2026 fees (Development Services Fees By-law 2026-0057, effective July 1, 2026): freestanding sign $456.00, sign on a building $341.00 [georgina.ca].
Forms and guides
- Georgina Building By-law 2026-0058 (BU-1) (Town of Georgina, by-law)
- Georgina Development Services Fees By-law 2026-0057 (AD-5) (Town of Georgina, fee schedule)
- Georgina Application for a Permit to Construct or Demolish (2026) (Town of Georgina, application form)
- Georgina Sign By-law 2006-0062 (PUT-1) (Town of Georgina, by-law)
Official pages
Track Building Permit: Sign Structure Regulated by the Building Code (Georgina) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.