Permit Library › Other GTA municipalities › Town of Georgina › Building permits (Building Division)
Building Permit: Interior Alteration or Tenant Fit-up (Georgina)
Building permit under Georgina Building By-law 2026-0058 (BU-1) for renovations, repairs and interior alterations, including commercial tenant fit-ups [georgina.ca].
You need it when: You renovate, repair or alter the inside of a building in Georgina, including a tenant fit-up, a new or resized opening or a finished basement.
Why is it needed?
- A permit is needed for renovations, repairs and alterations, new or resized door and window openings, finishing a basement and converting a room to a bedroom [georgina.ca].
- All new plumbing and the replacement of any part of a plumbing system need a permit [georgina.ca].
- Like-for-like fixture replacement, same-size doors and windows, painting and cupboards with no plumbing work need no permit [georgina.ca].
When should you apply?
- Check zoning first, because zoning review is required for all building permit applications [georgina.ca].
- If the work changes the use of the space, the change of use also needs a permit [georgina.ca].
- For an industrial, commercial or institutional fit-up, approvals from the Operations and Engineering Department and outside agencies will likely be required before issuance [georgina.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (2026) and Schedule 1 Designer Information [georgina.ca]
- One digital site plan and one digital set of scaled drawings [georgina.ca]
- Renovation and Alteration checklist (2026), or the Commercial Building (ICI) checklist for a fit-up [georgina.ca]
- Floor plans and plumbing or HVAC drawings where plumbing or HVAC changes [georgina.ca]
- Letter of Authorization if the applicant is not the owner [georgina.ca]
How do you submit it?
- Apply on the Building Permit Application Portal at georgina.my.site.com, with all documents as unsecured PDFs flattened to a single layer [georgina.ca].
- Building Division: building@georgina.ca, 905-476-4301 ext. 3007 [georgina.ca].
What are the fees?
2026 minimum building permit fee: $184.00 for Part 9 residential work and $304.00 for other buildings (Development Services Fees By-law 2026-0057) [georgina.ca]. Standalone plumbing fixtures are $32.00 per device [georgina.ca].
Forms and guides
- Georgina Building By-law 2026-0058 (BU-1) (Town of Georgina, by-law)
- Georgina Development Services Fees By-law 2026-0057 (AD-5) (Town of Georgina, fee schedule)
- Georgina Application for a Permit to Construct or Demolish (2026) (Town of Georgina, application form)
- Georgina Schedule 1: Designer Information (Town of Georgina, application form)
- Georgina Renovation and Alteration Checklist and Guide (2026) (Town of Georgina, checklist)
- Georgina Commercial Building (ICI) Checklist (Town of Georgina, checklist)
- Georgina Commitment to General Review (Town of Georgina, application form)
Official pages
Track Building Permit: Interior Alteration or Tenant Fit-up (Georgina) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.