Building Permit: New House, Addition or Additional Residential Unit (Georgina)
Building permit under Georgina Building By-law 2026-0058 (BU-1) for a new house, an addition or an additional residential unit, issued by the Building Division [georgina.ca].
Why is it needed?
- A permit is needed for new buildings, additions, renovations, finishing a basement and converting a room to a bedroom [georgina.ca].
- Zoning review is required for every building permit application, so check zoning first [georgina.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- Get a Site Alteration and Entrance Permit from Development Engineering first, because it is needed before the building permit is issued [georgina.ca].
- A new house also needs a Permit to Connect to municipal water and sewer, or a separate septic permit where there are no municipal services [georgina.ca].
- Access from a Regional road needs a York Region entrance permit, and land regulated by the LSRCA needs its approval [georgina.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (2026) and Schedule 1 Designer Information [georgina.ca]
- One digital site plan and one digital set of scaled drawings [georgina.ca]. Forms are signed, dated and kept separate from the drawings [georgina.ca]
- Letter of Authorization if the applicant is not the owner [georgina.ca]
- Heat loss design where an addition increases floor area by 15% or more [georgina.ca]
- New Houses and Additions checklist (2026), or the Additional Residential Unit checklist (2026) for a unit [georgina.ca]
How do you submit it?
- Apply on the Building Permit Application Portal at georgina.my.site.com, with all documents as unsecured PDFs flattened to a single layer [georgina.ca].
- Building Division: building@georgina.ca, 905-476-4301 ext. 3007 [georgina.ca].
What are the fees?
2026 minimum building permit fee: $184.00 for Part 9 residential work (Development Services Fees By-law 2026-0057) [georgina.ca]. The Site Alteration and Entrance Permit for a principal building is $360 plus a $2,500 refundable security deposit [georgina.ca]. Town development charge for a single or semi-detached house, effective July 1, 2026: $34,219.00 town-wide, with higher area-specific rates in Keswick and Sutton [georgina.ca].
Forms and guides
- Georgina Building By-law 2026-0058 (BU-1) (Town of Georgina, by-law)
- Georgina Development Services Fees By-law 2026-0057 (AD-5) (Town of Georgina, fee schedule)
- Georgina Application for a Permit to Construct or Demolish (2026) (Town of Georgina, application form)
- Georgina New Houses and Additions Checklist and Guide (2026) (Town of Georgina, checklist)
- Georgina Schedule 1: Designer Information (Town of Georgina, application form)
- Georgina Additional Residential Unit Checklist (2026) (Town of Georgina, checklist)
- Georgina Renovation and Alteration Checklist and Guide (2026) (Town of Georgina, checklist)
- Georgina Letter of Authorization (Town of Georgina, application form)