Engineering Drawing Approval for Site Plan or Subdivision Servicing (East Gwillimbury)
Development Engineering approval of servicing drawings for a site plan or subdivision in East Gwillimbury, under the Town's Engineering Standards and Design Criteria [eastgwillimbury.ca].
Why is it needed?
- Development Engineering reviews site plans and handles the subdivision agreement, engineering drawings, lot grading, acceptance and assumption for plans of subdivision [eastgwillimbury.ca].
- The Town holds a CLI-ECA, so sanitary and storm sewer designs are not submitted to the MECP, though stormwater ponds serving over 60 ha go to the MECP directly [eastgwillimbury.ca].
- Your consultant must also obtain approvals from other authorities, such as the Region of York, LSRCA and utility companies [eastgwillimbury.ca].
When should you apply?
- Engineering drawing approvals may be revoked if no Subdivision Agreement is signed within two years of drawing approval [eastgwillimbury.ca].
- After the works are built, a maintenance period of at least 13 months runs before the Town assumes them [eastgwillimbury.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- Engineering drawings prepared to the Engineering Standards and Design Criteria [eastgwillimbury.ca]
- Sanitary and storm sewer design sheets [eastgwillimbury.ca]
- Form 1 Record of Watermains with a General Services Plan [eastgwillimbury.ca]
- Overall lot grading plan prepared by a professional engineer [eastgwillimbury.ca]
- Approvals from other agencies such as the Region of York and LSRCA [eastgwillimbury.ca]
How do you submit it?
- Development Engineering reviews the engineering drawings as part of the site plan or subdivision process run by the Planning Branch [eastgwillimbury.ca].
What are the fees?
2026 fee: engineering review, inspection and administration at 5% of estimated construction costs (Schedule B, Fees and Charges By-law 2015-078) [eastgwillimbury.ca]. 2026 CLI-ECA review fees (Schedule I, indexed January 1, 2026): $5,938.80 for sewers or for an oil grit separator, LID or underground storage, and $8,337.10 for a stormwater pond or a pumping station [eastgwillimbury.ca].