Building Permit: New House, Addition or Additional Dwelling Unit (Clarington)
Building permit from the Clarington Building Division for a new house, an addition or an additional dwelling unit, under the Building Code Act and the Ontario Building Code [clarington.net].
Why is it needed?
- The Municipality lists additional dwelling units, such as basement or in-house apartments, among the work that may need a building permit [clarington.net].
- Staff review the application against the Ontario Building Code, the Building Code Act, the zoning by-law and all applicable laws [clarington.net].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- Building a house starts with a consultation with the Planning Department and the Building Division, on the main floor of the Municipal Administrative Centre, to confirm zoning such as setbacks, lot coverage and maximum height [clarington.net].
- Planning staff also tell you about any other processes needed first, and every applicable law on the Applicable Law Checklist must be in place before the permit can be issued [clarington.net].
- On a property designated under the Ontario Heritage Act, work that needs a building permit also needs a heritage permit [clarington.net].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Building permit application, filled out and paid for in the Service Clarington portal [clarington.net]
- Schedule 1: Designer Information [clarington.net]
- Drawings and documents uploaded as set out in the guide for submitting electronic documents [clarington.net]
- Energy Efficiency Design Summary, with drawings that meet the Snow Load Requirements [clarington.net]
- Grading, Occupancy, and Damage Deposit Form, where it applies [clarington.net]
- Drawings as shown in the General Requirements for Residential Building Permits and the Sample Drawings for Residential Additions, since requirements vary by property [clarington.net]
How do you submit it?
- Log in or create an account on the Service Clarington portal, service.clarington.net, fill out the building permit application and pay the fee, then submit all required documents [clarington.net].
- Building Division: 905-623-3379 ext. 2660, BuildingPermits@clarington.net. The approval is confirmed by email [clarington.net].
What are the fees?
The fee is paid in the portal when you apply. Building permit fees are set out in the Building By-law, and the Fees and Charges page suggests calling or visiting the Building Services Division before you start to work out your fees [clarington.net]. Development charges may also apply and are set out on their own page [clarington.net].
Forms and guides
- Clarington Schedule 1: Designer Information (Municipality of Clarington, application form)
- Clarington Guide for Submitting Electronic Documents (Municipality of Clarington, guide)
- Clarington Applicable Law Checklist (Municipality of Clarington, checklist)
- Clarington General Requirements for Residential Building Permits (Municipality of Clarington, guide)
- Clarington Grading, Occupancy, and Damage Deposit Form (Municipality of Clarington, application form)
- Clarington Damage Deposit Form (Municipality of Clarington, application form)
- Clarington Sample Drawings for Residential Additions (Municipality of Clarington, guide)
- Clarington Energy Efficiency Design Summary (Municipality of Clarington, application form)
- Clarington Snow Load Requirements (Municipality of Clarington, guide)
Official pages
- Building and demolition permits
- Service Clarington portal
- Requirements for residential building permits (PDF)
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.