Permit Library › Other GTA municipalities › Town of Caledon › Development Engineering, grading and site alteration
Lot Grading Approval (Caledon)
Lot Grading Approval from Town of Caledon Development Engineering, based on a plan that meets STD DWG 300 Minimum Requirements for Lot Grading Plans [caledon.ca].
You need it when: Work on a lot in Caledon needs a lot grading plan reviewed and approved by the Town's Development Engineering.
Why is it needed?
- Development Engineering sets the minimum content of a lot grading plan in STD DWG 300 [caledon.ca].
- The approval fee includes review and two inspections, with a charge for each extra inspection [caledon.ca].
When should you apply?
- Prepare the grading plan to STD DWG 300 Minimum Requirements for Lot Grading Plans before you submit it [caledon.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- Lot grading plan meeting STD DWG 300 Minimum Requirements for Lot Grading Plans [caledon.ca]
How do you submit it?
- Ask Development Engineering at deveng@caledon.ca how to submit the lot grading plan [caledon.ca].
What are the fees?
2026 fee: Lot Grading Approval review (including 2 inspections) $570.00, additional inspection $190.00 (Fees By-law 2025-105, Schedule L) [caledon.ca].
Forms and guides
- Caledon 2026 Fees By-law 2025-105 (Town of Caledon, fee schedule)
Official pages
- STD DWG 300 lot grading plan requirements (PDF)
- Standards, policies and guidelines
- 2026 Fees By-law (PDF)
Track Lot Grading Approval (Caledon) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.