Permit Library › Other GTA municipalities › Town of Caledon › Roads and right-of-way (Operations)
Entrance Culvert and Driveway Entrance Application (Caledon)
Town of Caledon approval for a new property entrance and culvert off a Town road, with culvert fees set in Schedule K of the 2026 Fees By-law [caledon.ca].
You need it when: You build a new access or driveway entrance from a Town road to a property in Caledon, or widen an existing one.
Why is it needed?
- The Town looks after storm water, including catch basins, culverts and ditches, while water and wastewater services come from the Region of Peel [caledon.ca].
- Contact the Town to build an access or entrance to a property, and there are fees for installing a new culvert [caledon.ca].
When should you apply?
- Contact the Town before work starts, because the Fees By-law adds surcharges for requests with less than 2 business days notice and for work started without a permit [caledon.ca].
- The Town standard drawing STD DWG 402 shows the driveway entrance detail [caledon.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- Culvert application to the Town [caledon.ca]
- Town standard drawing STD DWG 402 Driveway Entrance Detail, for reference [caledon.ca]
How do you submit it?
- Contact the Town of Caledon to build an access or entrance to a property [caledon.ca].
What are the fees?
The 2026 Fees By-law (Schedule K) sets a culvert application fee, an extra charge per metre for culverts longer than 9 m, and surcharges for rush requests and for work started without a permit [caledon.ca]. Curb cutting for entrance widenings is charged at cost recovery plus 15% [caledon.ca].
Forms and guides
- Caledon 2026 Fees By-law 2025-105 (Town of Caledon, fee schedule)
Official pages
Track Entrance Culvert and Driveway Entrance Application (Caledon) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.