Permit Library › Other GTA municipalities › Town of Caledon › Building permits (Building Services)

Designated Structure Permit: Retaining Wall, Solar Collectors or Storage Tank (Caledon)

Building permit for a designated structure (retaining wall over 1 m, solar collectors or storage tank) under Caledon Building By-law 2025-117 and the Ontario Building Code [caledon.ca].

You need it when: You build a retaining wall over 1 m high, install solar collectors on a house, or install a storage tank in Caledon.

Why is it needed?

When should you apply?

How long does review take?

Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]

What documents does a complete application need?

How do you submit it?

What are the fees?

2026 fees: retaining walls $12.18 per linear m, solar collectors (houses) $192.00, storage tank $370.00 (Fees By-law 2025-105) [caledon.ca].

Forms and guides

Official pages

Track Designated Structure Permit: Retaining Wall, Solar Collectors or Storage Tank (Caledon) free.
Start with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Track this permit free

Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.