Stormwater Alteration Approval under the Town CLI-ECA (Caledon)
Town approval of a low-risk public stormwater alteration under its Consolidated Linear Infrastructure Environmental Compliance Approval (CLI-ECA) No. 324-S701 [caledon.ca].
You need it when: Work alters public stormwater works in Caledon, such as storm sewers, ditches, culverts, stormwater management facilities or MTDs, that the Town approves under its CLI-ECA.
Why is it needed?
- Under the MECP CLI-ECA program, which the Town joined in October 2022, the Town approves low-risk public stormwater alterations itself [caledon.ca].
- Private stormwater infrastructure, single-parcel alterations and works on industrial, commercial or institutional land are not covered and go directly to MECP, and some low-risk activities register on EASR instead [caledon.ca].
- Sewage works are approved by the Region of Peel, not the Town [caledon.ca].
When should you apply?
- Your Development Engineering Project Manager tells you when the drawings are far enough along, which is generally after the second engineering submission [caledon.ca].
- Parts 1 to 4 of the form must be complete before construction can proceed, and the Town completes Part 5 after construction [caledon.ca].
- Other approvals may also apply, such as TRCA or CVC [caledon.ca].
How long does review take?
Plan for about 15 business days. City service standard [caledon.ca]
What documents does a complete application need?
- Record of Future Alteration form: SW1 for storm sewers, ditches and culverts, SW2 for SWM facilities and MTDs, or SW3 for third-party collection [caledon.ca]
- Stormwater Design Report and drawings [caledon.ca]
- Asset Information Table, on the Town template [caledon.ca]
- The SW1, SW2, SW2-MTD or SW3 checklist for your form [caledon.ca]
How do you submit it?
- Your Development Engineering Project Manager tells you when to submit and reviews the application [caledon.ca].
What are the fees?
2026 fee: SW1 form $3,000 per sewershed, SW2 form $6,000 per sewershed and SW3 form $2,500 per subdivision, excluding HST (User Fee By-law) [caledon.ca]. 2026 fee: ECA Monitoring and Reporting Approval Fee $5,000 plus costs, plus HST, where costs include review hours beyond 30 hours [caledon.ca].
Official pages
- Standards, policies and guidelines (CLI-ECA)
- CLI-ECA No. 324-S701 (PDF)
- Record of Future Alteration form SW1 (PDF)
Track Stormwater Alteration Approval under the Town CLI-ECA (Caledon) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.