Building Permit: New House, Addition or Additional Residential Unit (Caledon)
Building permit under Caledon Building By-law 2025-117 for a new house, an addition or an additional residential unit, issued by Building Services [caledon.ca].
Why is it needed?
- The Town requires a building permit for new houses and additions [caledon.ca].
- Up to four units are permitted as of right Town-wide under Zoning By-law 2006-50, s. 4, but an additional residential unit still needs a building permit, even when built from the Town's pre-approved plans [caledon.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to the permit in every Ontario municipality [ON].
When should you apply?
- On a lot with a septic system, get the Town's certificate of approval for the sewage system design first, then apply for the building permit for the new building or addition [caledon.ca].
- New and existing additional residential units must be registered, and an additional residential unit must be licensed before it is occupied. The Town says further information on registration will be available soon [caledon.ca].
- Other approvals may be needed first, such as TRCA, Credit Valley Conservation, the Niagara Escarpment Commission, Oak Ridges Moraine site plan control or Town heritage approval [caledon.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish (2026) [caledon.ca]
- Drawings and documents listed on the Residential (Non-High Rise) New or Addition checklist [caledon.ca]
- Applicable Law Declaration and Land and Building Use Declaration [caledon.ca]
- Schedule 1 designer information and a site plan, also needed with the Town's pre-approved ARU plans [caledon.ca]
- EEDS form, performance or prescriptive [caledon.ca]
How do you submit it?
- Apply online through the Construction Companion portal or the Building Services online form, because the Town accepts building permit applications online only [caledon.ca].
- Questions go to Building Services at buildingpermits@caledon.ca or 905-584-2272 ext. 2233, and zoning questions to zoning@caledon.ca [caledon.ca].
What are the fees?
2026 fee: $18.12 per m2 for detached, semi-detached, townhouse and duplex dwellings, $15.21 per m2 for a heated addition, $14.40 per m2 for an unheated addition and $5.93 per m2 for a finished basement, with a $193.00 minimum permit fee (2026 Fees By-law 2025-105) [caledon.ca]. Gentle Density CIP grants are available for ARU permits issued on or after November 25, 2025 [caledon.ca].
Forms and guides
- Caledon Building By-law 2025-117 (Town of Caledon, by-law)
- Caledon 2026 Fees By-law 2025-105 (Town of Caledon, fee schedule)
- Caledon Application for a Permit to Construct or Demolish (2026) (Town of Caledon, application form)
- Caledon Applicable Law Checklist (Town of Caledon, checklist)
- Caledon Residential New or Addition Building Permit Checklist (Town of Caledon, checklist)