Permit Library › Other GTA municipalities › City of Burlington › Engineering, grading and pool permits
Combined Residential Swimming Pool Permit (Burlington)
One Burlington e-form that combines the Zoning Clearance Certificate, forestry review and Pool Enclosure Permit under Pool By-law 074-2005 [burlington.ca].
You need it when: You install a pool or any body of water 600 mm deep or more in Burlington, or a hot tub or swim spa over 8 m2.
Why is it needed?
- Pool By-law 074-2005 requires a pool enclosure permit for any body of water 600 mm deep or more [burlington.ca].
- The combined application also covers the zoning clearance and the forestry (tree) review [burlington.ca].
- Hot tubs and swim spas over 8 m2 use the same combined application [burlington.ca].
When should you apply?
- Apply before you install the pool [burlington.ca].
- Pool installation can also need a site alteration permit, so check the Site Alteration Screening Checklist [burlington.ca].
- Do not fill the pool until the enclosure passes inspection [burlington.ca].
How long does review take?
Plan for about 30 business days. City guidance [burlington.ca]
What documents does a complete application need?
- Combined Residential Swimming Pool Application e-form [burlington.ca]
- Site Alteration Screening Checklist [burlington.ca]
How do you submit it?
- Apply online with the Combined Residential Swimming Pool Application e-form, the only way to apply [burlington.ca].
Forms and guides
- Burlington Site Alteration Screening Checklist (By-law 064-2014) (City of Burlington, checklist)
Official pages
Track Combined Residential Swimming Pool Permit (Burlington) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.