Designated Structure Permit (Burlington)
Building Department permit for a Building Code designated structure, listed in class B of fee Schedule A to By-law 18-2025 with balconies, chimneys and relocations [burlington.ca].
You need it when: You build a structure in Burlington that the Ontario Building Code treats as a designated structure.
Why is it needed?
- Schedule A to By-law 18-2025 class B covers stand-alone and miscellaneous work, including designated structures [burlington.ca].
- The Ontario Building Code, O. Reg. 163/24, regulates designated structures and applies in every Ontario municipality [ON].
When should you apply?
- If the work includes a retaining wall, use the City's site alteration screening checklist, since retaining wall construction is one of its examples of work that may need a site alteration permit before construction [burlington.ca].
- Once the permit is issued, start the work within six months, or the permit may be revoked under s. 8 of the Building Code Act [ON].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Building permit application emailed to buildingpermits@burlington.ca [burlington.ca]
- Site Alteration Screening Checklist, where the work involves filling, grading or excavation [burlington.ca]
How do you submit it?
- Email the application to buildingpermits@burlington.ca with the subject line "Building Permit Application - <address>", as paper applications are not accepted [burlington.ca].
- Files over 20 MB need a large-file transfer request, and the Building Department at 426 Brant Street answers questions at 905-335-7731 [burlington.ca].
What are the fees?
Class B of Schedule A to By-law 18-2025 sets the fee, and Schedule A charges a minimum fee of $377.00 for all work unless otherwise indicated [burlington.ca].
Forms and guides
- Burlington Building Permit Fee Schedule A to By-law 18-2025 (City of Burlington, fee schedule)
- Burlington Building Permit By-law 030-2026 (City of Burlington, by-law)
Official pages
- Applying for a building permit
- Building permit fee Schedule A to By-law 18-2025
- Site alteration permits
Track Designated Structure Permit (Burlington) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.