Permit Library › Other GTA municipalities › Township of Brock › Building permits (Building Department)
Plumbing Permit (Brock)
Plumbing permit from the Brock Building Department for water and drain pipes, fixtures and new plumbing appliances, under Building By-law 3308-2024 [townshipofbrock.ca].
You need it when: You install water or drain pipes, plumbing fixtures or new plumbing appliances in the Township of Brock.
Why is it needed?
- A plumbing permit is required for water and drain pipes and fixtures [townshipofbrock.ca].
- Most renovations need a permit, and the Township names new plumbing appliances as one example [townshipofbrock.ca].
- The Building Department reviews applications against the Ontario Building Code, the Zoning By-law and other applicable law [townshipofbrock.ca].
When should you apply?
- Get the permit before the plumbing work starts [townshipofbrock.ca].
- For a new home, a water and sewer connection permit from Durham Region Public Works is also needed, if applicable [townshipofbrock.ca].
- Plumbing has its own required inspection stages, booked through Cloudpermit [townshipofbrock.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Building permit application in Cloudpermit [townshipofbrock.ca]
- Complete Application Checklist and Applicable Law Checklist [townshipofbrock.ca]
- Plumber's licence information, for a new home [townshipofbrock.ca]
- Letter of Authorization if a contractor or designer applies for the owner [townshipofbrock.ca]
How do you submit it?
- Apply online through Cloudpermit at ca.cloudpermit.com/townshipofbrock, where you can check the status of the application and get inspection results by email [townshipofbrock.ca].
- Building Department: building@brock.ca, 705-432-2355 ext. 230 [townshipofbrock.ca].
What are the fees?
Building permit fees are set in Schedule 'A' of Building By-law 3308-2024, and the Township posts a 2026 Schedule A fees PDF [townshipofbrock.ca].
Forms and guides
- Brock Building By-law 3308-2024 (Township of Brock, by-law)
- Brock Building Permit Fees, Schedule A (2026) (Township of Brock, fee schedule)
- Brock Building Permit Complete Application Checklist (Township of Brock, checklist)
- Brock Applicable Law Checklist (2022) (Township of Brock, checklist)
- Brock Schedule 1: Designer Information (Township of Brock, application form)
Official pages
Track Plumbing Permit (Brock) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.