Township of Brock Public Works consent for utility work in the municipal right-of-way, including telecom, gas, electricity, water, stormwater, boring and poles [townshipofbrock.ca].
You need it when: You install utility infrastructure such as telecom, gas, electricity, water, wastewater or stormwater lines or poles, or excavate, bore or restore, within a Township of Brock road right-of-way.
Why is it needed?
- Municipal Consent is required when utilities install infrastructure in the municipal right-of-way [townshipofbrock.ca].
- The Township says "All work within the right-of-way requires municipal consent", covering utilities, telecom, gas, electricity, water and wastewater, stormwater, excavation or boring, poles and restoration [townshipofbrock.ca].
When should you apply?
- Get Municipal Consent before you excavate, bore or place poles in the Township right-of-way [townshipofbrock.ca].
- Underground utility work that may block the road allowance also needs a Road Occupancy Permit [townshipofbrock.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- Municipal Consent Application (online form) [townshipofbrock.ca]
- Municipal Consent fee of $150.00 [townshipofbrock.ca]
How do you submit it?
- Apply online through the Township's Municipal Consent Application web form [townshipofbrock.ca].
What are the fees?
Municipal Consent fee: $150.00, as listed on the Township page with no year given [townshipofbrock.ca].
Official pages
Track Municipal Consent for Utility Work (Brock) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.