Permit Library › Other GTA municipalities › Township of Brock › Building permits (Building Department)
Building Permit: New House, Addition or Renovation (Brock)
Building permit from the Township of Brock under Building By-law 3308-2024 for a new house, an addition or most renovations, such as a finished basement [townshipofbrock.ca].
You need it when: You build a new house, put an addition on a house, or renovate a house in the Township of Brock, such as finishing a basement or changing the heating system type.
Why is it needed?
- You must have a building permit before starting a building or renovation project in the Township of Brock [townshipofbrock.ca].
- Permits are required for all new single family dwellings, all additions and most renovations, including roof-mounted solar panels, new plumbing appliances and a change of heating system type [townshipofbrock.ca].
- Development charges apply to most new homes [townshipofbrock.ca].
When should you apply?
- For a new house, get an entrance permit from the Township's Public Works Department, Durham Region or MTO, and any Durham Region Public Works water and sewer connection permit, to include with the application [townshipofbrock.ca].
- Get Conservation Authority clearance in a regulated area, and MTO clearance in an MTO Highway Corridor Management control area, before the permit can issue [townshipofbrock.ca].
- If work has not begun within 6 months of permit issuance, plans must be updated to the 2024 Building Code or the permit may be revoked [townshipofbrock.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Site plan with setbacks, and a grading plan for every new home in a Residential Zone [townshipofbrock.ca]
- Construction plans with engineer-stamped roof truss drawings reviewed by the designer [townshipofbrock.ca]
- Heat loss and duct design, with the Schedule 1 designer information form for the house and duct design [townshipofbrock.ca]
- Septic system design and permit, well report and plumber licence information, where they apply [townshipofbrock.ca]
- Complete Application Checklist and Applicable Law Checklist [townshipofbrock.ca]
- Letter of Authorization when someone applies for the owner [townshipofbrock.ca]
How do you submit it?
- Apply and track the application on the Township's Cloudpermit portal at ca.cloudpermit.com/townshipofbrock, which emails status updates and, after issuance, inspection results [townshipofbrock.ca].
- Building Department: building@brock.ca, 705-432-2355 ext. 230 [townshipofbrock.ca].
Forms and guides
- Brock Building By-law 3308-2024 (Township of Brock, by-law)
- Brock Building Permit Fees, Schedule A (2026) (Township of Brock, fee schedule)
- Brock Building Permit Complete Application Checklist (Township of Brock, checklist)
- Brock Applicable Law Checklist (2022) (Township of Brock, checklist)
- Brock Letter of Authorization (Township of Brock, application form)
- Brock Schedule 1: Designer Information (Township of Brock, application form)
Official pages
Track Building Permit: New House, Addition or Renovation (Brock) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.