Permit Library › Other GTA municipalities › City of Brampton › Building permits (Building Division)
Tent, Stage or Temporary Event Structure Permit (Brampton)
Building permit under Brampton Building By-law 387-2006 for a temporary tent or event stage, or a permanent tent or sprung structure, from the Building Division [brampton.ca].
You need it when: You put up a temporary tent or event stage in Brampton, or a permanent tent or sprung structure.
Why is it needed?
- Temporary stages or tents above a certain size need a building permit, a zoning permit or both [brampton.ca].
- The Ontario Building Code, O. Reg. 163/24, regulates tents and applies in every Ontario municipality [ON].
When should you apply?
- Apply for the tent permit to construct, with the site plan and specifications, at least 21 days before the event [brampton.ca].
- Give a copy of the Temporary Tent Permit to the Event Support Liaison 7 days before the event [brampton.ca].
- A public event on City property also needs a Special Event Advisory Team (SEAT) application at least 60 days before the event [brampton.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a permit to construct [brampton.ca]
- Site plan and tent specifications [brampton.ca]
- Temporary Tent Permit package [brampton.ca]
- Temporary Stages and Structures checklist, for an event stage [brampton.ca]
How do you submit it?
- Apply to the Building Division on the Brampton Building and Business Portal [brampton.ca].
- Event questions: events@brampton.ca, 905.874.2000 [brampton.ca].
What are the fees?
2026 fee: $444.85 flat for a temporary tent, and $4.68 per m2 for a permanent tent or sprung structure (Building By-law 387-2006 Schedule A1) [brampton.ca].
Forms and guides
- Brampton Building Permit Fee Schedule (2026) (City of Brampton, fee schedule)
Official pages
Track Tent, Stage or Temporary Event Structure Permit (Brampton) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.