Permit Library › Other GTA municipalities › City of Brampton › Building permits (Building Division)
Sign Permit (Brampton)
Sign permit from the Brampton Building Division under Sign By-law 399-2002 for permanent, temporary, portable, window and flag signs [brampton.ca].
You need it when: You install a new ground, wall, roof or mobile sign in Brampton, replace a sign with one of a different size or design, or put up a temporary banner, development or real estate sign.
Why is it needed?
- A sign permit is required to install a new sign, to replace a sign with one different in size or design, or to put up a temporary sign [brampton.ca].
- You may also need a building permit if your sign is large or structurally complex [brampton.ca].
When should you apply?
- Before you apply, check the Sign By-law, get permission from the property owner or landlord and prepare drawings showing dimensions [brampton.ca].
- For portable signage at an event, submit the approvals or permit to the Building Division 30 days before the event [brampton.ca].
- After approval, display the permit on site and call for inspections where required, such as a footing inspection for a ground sign [brampton.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Completed application form [brampton.ca]
- Sign drawings and specifications [brampton.ca]
- Site plan or survey [brampton.ca]
- Permit package for the sign type: permanent, window, flag or A-frame [brampton.ca]
- Notice of Permission to Display a Portable Sign, for a portable sign [brampton.ca]
- Certificate of Insurance form [brampton.ca]
How do you submit it?
- Apply on the Brampton Building and Business Portal under Signs - Permanent Sign, Signs - Window Signs/Builder Flags or Portable/Mobile Signs [brampton.ca].
- Building Division: 905.874.2401 or 311 [brampton.ca].
Forms and guides
- Brampton Building Permit Fee Schedule (2026) (City of Brampton, fee schedule)
- Brampton Sign By-law 399-2002 (City of Brampton, by-law)
- Brampton Permanent Sign and Sales Office Sign Permit Package (City of Brampton, guide)
Official pages
Track Sign Permit (Brampton) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.