Permit Library › Other GTA municipalities › City of Brampton › Building permits (Building Division)

Designated Structure Permit: Retaining Wall, Shoring, Underpinning, Racking or Outdoor Pool (Brampton)

Stand-alone permit under Brampton Building By-law 387-2006 for designated structures such as retaining walls, shoring, underpinning, racking and outdoor pools or spas [brampton.ca].

You need it when: You build a retaining wall, shoring, underpinning, storage racking or an outdoor pool or spa in Brampton that the Building Code treats as a designated structure.

Why is it needed?

When should you apply?

How long does review take?

Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]

What documents does a complete application need?

How do you submit it?

What are the fees?

2026 fee: $444.85 for an outdoor pool or spa designated structure permit (Building By-law 387-2006) [brampton.ca].

Forms and guides

Official pages

Track Designated Structure Permit: Retaining Wall, Shoring, Underpinning, Racking or Outdoor Pool (Brampton) free.
Start with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Track this permit free

Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.