Conditional or Phased Building Permit (Brampton)
Conditional and phased building permits, named in Brampton Building By-law 387-2006 and priced in its 2026 fee schedule [brampton.ca].
You need it when: You need to start part of the work on a Brampton building before the full building permit issues, or want the permit issued in phases.
Why is it needed?
- Building By-law 387-2006 provides for conditional permits and phased permits [brampton.ca].
- Starting construction before a permit is issued is charged 50% of the permit fee, to a maximum of $13,360.76 (2026 fee schedule) [brampton.ca].
When should you apply?
- Have the conditional or phased permit in place before construction starts on site, because the fee schedule charges extra for construction started before a permit is issued [brampton.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Building permit application on the Brampton Building and Business Portal [brampton.ca]
How do you submit it?
- Apply online on the Brampton Building and Business Portal at bramptonbbp.brampton.ca, which takes all industrial, commercial and institutional building permit applications [brampton.ca].
- Building Division: building.inquiries@brampton.ca, 905.874.2401 or 311, Flower City Community Campus, 8850 McLaughlin Road South, Unit 1 [brampton.ca].
What are the fees?
2026 fee schedule: conditional permit 10% of the full permit fee, minimum $593.12 and maximum $4,008.22, conditional permit amendment $593.12, and phased permits $444.85 each [brampton.ca].
Forms and guides
- Brampton Building Permit Fee Schedule (2026) (City of Brampton, fee schedule)
Official pages
- Building permit fee schedule, 2026
- Building By-law 387-2006
- Industrial, commercial and institutional permits
Track Conditional or Phased Building Permit (Brampton) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.