Permit Library › Other GTA municipalities › City of Brampton › Building permits (Building Division)
Certified Model Home Permit (Brampton)
Certified Model Program permits under Brampton Building By-law 387-2006: a model base permit for a house design, then a sited permit for each lot built from it [brampton.ca].
You need it when: You are a home builder repeating one house design on many lots in Brampton and want a certified model base permit with a sited permit for each lot.
Why is it needed?
- Under the Certified Model Program, the City issues a certified model base permit and then sited permits for each lot [brampton.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to each permit in every Ontario municipality [ON].
When should you apply?
- Get the certified model base permit before you apply for the sited permits built from it [brampton.ca].
- A certified model application that remains incomplete for twelve months after the date of application is deemed abandoned (Building By-law 387-2006 s. 4(9)) [brampton.ca].
- Book each inspection at least two business days before each stage of construction (Building By-law 387-2006 s. 10(1)) [brampton.ca].
How long does review take?
Plan for about 10 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Certified Model Program package [brampton.ca]
- Schedule 1 Designer Information form [brampton.ca]
- Applicable Law Checklist [brampton.ca]
How do you submit it?
- Apply on the Brampton Building and Business Portal [brampton.ca].
- Building Division: building.inquiries@brampton.ca, 905.874.2401 or 311, Flower City Community Campus, 8850 McLaughlin Road South, Unit 1 [brampton.ca].
What are the fees?
2026 fee: $13.04 per m2 for a certified model base permit, and $14.04 per m2 (minimum $2,004.10) for a house sited from a certified model (Building By-law 387-2006 Schedule A1) [brampton.ca]. Transfer of a certified model is $415.18 and re-siting is $400.82 or $801.65 (2026 fee schedule) [brampton.ca].
Forms and guides
- Brampton Building Permit Fee Schedule (2026) (City of Brampton, fee schedule)
- Brampton Certified Model Program Package (City of Brampton, guide)
Official pages
Track Certified Model Home Permit (Brampton) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.