Site Alteration Permit: Fill, Topsoil or Grade Change (Aurora)
Site alteration permit under Aurora Site Alteration By-law 6226-19 for fill, topsoil removal and grade changes, issued by the director responsible for the Engineering Division [aurora.ca].
You need it when: You place or dump fill, remove topsoil or change the grade of land in Aurora, or change a grade set by a Town-approved grading plan.
Why is it needed?
- A permit is needed for any site alteration unless the by-law exempts it [aurora.ca].
- Work under 2.0 ha is exempt if fill is no deeper than 300 mm and totals no more than 50 m3, the grade does not change within 600 mm of a property line, watercourses, swales, ditches and neighbouring drainage are not affected, and sediment is controlled [aurora.ca].
- A permit is also needed to change any grade set by a Town-approved grading and drainage plan for a subdivision, rezoning, site plan or building permit [aurora.ca].
When should you apply?
- Get all other Town and agency approvals, such as LSRCA, TRCA or Region of York permits, and post any security or agreement the Director requires before the permit is issued [aurora.ca].
- The permit is valid 180 days and can be renewed for 180 days at a time, but it can be revoked if work has not started within 90 days [aurora.ca].
- Notify the Director within 48 hours of starting any land disturbing activity [aurora.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- Site Alteration Permit Application Form (2025), signed by the applicant and by the owner if different [aurora.ca]
- Three sets of drawings and a site alteration plan certified by a qualified person [aurora.ca]
- Proof of insurance and WSIB [aurora.ca]
- Security such as a letter of credit, with cost estimates for site stabilization and erosion and sediment control [aurora.ca]
- Geotechnical and environmental information, and heritage clearance or an archaeological assessment where it applies [aurora.ca]
- Related LSRCA, TRCA or Region of York permits [aurora.ca]
How do you submit it?
- Submit the form and drawings to the Engineering Division at engineering@aurora.ca, 905-726-4704, with the fee by cheque payable to The Town of Aurora [aurora.ca].
- Applications are not accepted unless the full fee and required material are received [aurora.ca].
What are the fees?
2026 fee: $812 flat plus $47 per hectare, and $406 flat plus $23.75 per hectare to renew (Fees and Charges By-law 6737-25, Schedule B) [aurora.ca]. The 2025 application form still shows an older worksheet of $796 plus $46 per hectare [aurora.ca]. The fee is non-refundable regardless of the outcome [aurora.ca].
Forms and guides
- Aurora Site Alteration Permit Application Form (2025) (Town of Aurora, application form)
- Aurora Site Alteration By-law 6226-19 (Town of Aurora, by-law)
Official pages
- Construction projects and site alteration downloads
- Site Alteration Permit Application Form
- Site Alteration By-law 6226-19
Track Site Alteration Permit: Fill, Topsoil or Grade Change (Aurora) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.