Permit Library › Other GTA municipalities › Town of Aurora › Engineering permits (Engineering Division)
Lot Grading Review and Inspection (Aurora)
Lot grading review and inspection by Aurora's Engineering Division, charged per lot under Fees and Charges By-law 6737-25, Schedule B [aurora.ca].
You need it when: Work on a lot in Aurora needs the Engineering Division to review and inspect the lot grading, including before a deposit is returned.
Why is it needed?
- A lot grading inspection is required before a deposit is returned [aurora.ca].
- The Town posts a Lot Grading and Drainage Brochure for contractors on its Construction Projects page [aurora.ca].
When should you apply?
- Changing a grade set by a Town-approved grading and drainage plan for a subdivision, rezoning, site plan or building permit needs a Site Alteration Permit (By-law 6226-19 s. 5.9(a)) [aurora.ca].
- For a pool, the grading review fee and a $3,000 security are collected with the pool permit fee [aurora.ca].
How long does review take?
No review time is published for this permit; ask the City when you apply.
What documents does a complete application need?
- Lot Grading and Drainage Brochure [aurora.ca]
How do you submit it?
- Contact the Engineering Division at engineering@aurora.ca, (365) 500-3116 to arrange a lot grading inspection [aurora.ca].
What are the fees?
2026 fee: $352 per lot for lot grading review and inspection, and $477 per lot plus $3,000 security for grading review and inspection for pool construction (Fees and Charges By-law 6737-25, Schedule B) [aurora.ca].
Official pages
Track Lot Grading Review and Inspection (Aurora) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.