Permit Library › Other GTA municipalities › Town of Aurora › Building permits (Building Division)
Designated Structure Permit: Retaining Wall, Shoring or Public Pool (Aurora)
Building Division permit for a designated structure, shoring or underpinning, or an outdoor public pool, charged under Schedule G of Aurora Fees and Charges By-law 6737-25 [aurora.ca].
You need it when: You build a retaining wall, shoring or underpinning, an outdoor public pool or another designated structure in Aurora.
Why is it needed?
- Schedule G of the 2026 Fees and Charges By-law has fee classes for accessory and designated structures, shoring and underpinning, and outdoor public pools under Building Code 3.11 [aurora.ca].
- The Ontario Building Code, O. Reg. 163/24, sets the permit rules for designated structures in every Ontario municipality [ON].
When should you apply?
- Changing a grade set by a Town-approved grading and drainage plan for a subdivision, rezoning, site plan or building permit also needs a Site Alteration Permit from the Engineering Division (By-law 6226-19 s. 5.9(a)) [aurora.ca].
- Work that uses the roadway, boulevard or sidewalk needs a Road Occupancy Permit before you begin the work [aurora.ca].
- Arrange locates through Ontario One Call before digging [aurora.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Application for a Permit to Construct or Demolish, the Town's building permit form [aurora.ca]
- Pre-Screening Questionnaire for Road Occupancy, listed with the building permit resources [aurora.ca]
How do you submit it?
- Apply through the CityView Portal at cvportal.aurora.ca, by email to building@aurora.ca, or on a USB drive in person [aurora.ca].
- Building Division: building@aurora.ca, (365) 500-2081, Town Hall, 100 John West Way [aurora.ca].
What are the fees?
2026 fee for an outdoor public pool (Building Code 3.11): $8.00 per m2 plus $547 per application for up to 4 hours of inspection (Fees and Charges By-law 6737-25, Schedule G) [aurora.ca]. For other designated structures and for shoring and underpinning, see Schedule G [aurora.ca].
Forms and guides
- Aurora Building By-law 6096-18 (office consolidation, as amended) (Town of Aurora, by-law)
- Aurora Building Permit Fee Handout 2026 (Town of Aurora, fee schedule)
- Aurora Application for a Permit to Construct or Demolish (Town of Aurora, application form)
Official pages
Track Designated Structure Permit: Retaining Wall, Shoring or Public Pool (Aurora) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.