Permit Library › Other GTA municipalities › Town of Ajax › Building permits (Building Services)
Site Servicing Permit (Ajax)
Site servicing permit from Town of Ajax Building Services, charged at 1.60% of the estimated servicing construction value [ajax.ca].
You need it when: Your Ajax project includes site servicing work, which Building Services permits separately from the building.
Why is it needed?
- Building Services lists a site servicing permit as its own application type, with a fee based on the value of the servicing work [ajax.ca].
- The Ontario Building Code, O. Reg. 163/24, applies to building permits in every Ontario municipality [ON].
When should you apply?
- Building Services runs a pre-screen review first, and the date of application is the day after the pre-screen is approved [ajax.ca].
- Construction work on a Town road or boulevard, including utility repairs or installations, also needs a Road Occupancy Permit, with stamped engineered drawings and an approved municipal consent for utility work where applicable [ajax.ca].
How long does review take?
Plan for about 20 business days. Building Code Div. C 1.3.1.3 [ON]
What documents does a complete application need?
- Site servicing application to Building Services through the OAP (residential) or by email to buildingpermits@ajax.ca (all others) [ajax.ca]
- Estimated servicing construction value, which sets the fee [ajax.ca]
- For work on a Town road or boulevard, Road Occupancy Permit form OPN-046, a traffic control plan and liability insurance of at least $2,000,000 naming the Town of Ajax as additional insured [ajax.ca]
How do you submit it?
- Residential applications go through the Town's Online Application Portal (OAP), and all others go by email to buildingpermits@ajax.ca [ajax.ca].
What are the fees?
1.60% of the estimated servicing construction value, as listed on the Town's Building Requirements and Permits page [ajax.ca].
Official pages
Track Site Servicing Permit (Ajax) free.
Track this permit freeStart with a 7-day Team trial with alerts and your whole team, then keep one permit free.
Sources are marked in the text: [TO] toronto.ca pages, [Guide] general industry guidance, [Plan] permit planning practice. Confirm on the official page before applying.