Submission checklists › Toronto Building
Part Building Permit A: Shoring & Excavation
City of Toronto: Toronto Building · version June 1, 2021, Rev. 2
Cover letter including
| 1 | Brief description of proposed work |
| 1 | Contents of the submission |
Application forms
| 2 | Application For a Permit to Construct or Demolish Form |
| 3 | Commitment to General Reviews – By Architect and Engineers Form – Structural, Shoring, Vibration |
| 4 | Vibration Control Declaration Form, including zone of influence report, pre-construction survey and monitoring program |
| 5 | Vibration Control and Zone of Influence plan/drawing |
| 6 | Municipal Road Damage Deposit Form is required for the intake of Building applications for new buildings; the requirement for payment is waived if Site Plan approval is required |
Plans and drawings
| 7 | Shoring Drawings |
| 8 | Architectural Drawings (as required for information) |
| 9 | Structural Drawings (as required for information) |
| 10 | Construction Details and Notes |
| 11 | Property Survey (R-Plan) |
| 12 | Pre-Construction Survey |
| 13 | Zone of Influence Drawings |
Technical supporting information
| 14 | Geotechnical Engineering Report |
| 15 | Geotechnical Instrumentation and Monitoring Plan (GIMP) Report |
| 16 | Preliminary Construction Impact Assessment Report |
| 17 | Construction Noise & Vibration Monitoring Plan |
| 18 | Construction Noise & Vibration Assessment Report |
| 19 | Property Owner Consent: Private Property Tie-back Agreements or Authorizations (as required for tie-backs into adjacent private properties) |
| 20 | Property Owner Consent: Tie-back & Piling Agreement with City Transportation Services (as required for tie-backs within the ROW) |
Notes
| 21 | Fees. Note: upon submitting all the required forms and documents, the City will send a submission status letter, indicating any deficiencies or, if complete, providing the required fees. |
| 22 | A Part Permit Application must contain the Main Building Permit Folder number. |
| 23 | A Part Permit can only be submitted once the main Building permit has been submitted and accepted. The Main Building Permit (BLD) must be submitted and, if not fully completed, the Building Division Director will provide approval to proceed with the acceptable percentage of completed documentation. |
| 24 | Engage with Toronto Water for a Dewatering Sewer Discharge Agreement at early stages of design and prior to Building Permit Application. Toronto Building will require Toronto Water confirmation that they have no objections to Toronto Building issuing the CP permit with a dewatering discharge clause. |
| 25 | This Permit Application Checklist should be read in conjunction with the Permit Application Checklist – General Notes. |
Submission requirements for building permit application are governed by Article 3 of Toronto Municipal Code, Chapter 363. This checklist identifies the scope of information typically required to support processing of this type of application in accordance with Chapter 363. Nevertheless, it is the responsibility of the applicant to consult with the approval authority prior to application submission to confirm the submission requirements for more complex applications. This checklist is not intended to be exhaustive. Other information necessary for the complete review of the building permit submission may be required by the Chief Building Official and in accordance with § 363.
Permits this checklist is for