Part Building Permit A: Shoring & Excavation

City of Toronto: Toronto Building · version June 1, 2021, Rev. 2

Cover letter including

1Brief description of proposed work
1Contents of the submission

Application forms

2Application For a Permit to Construct or Demolish Form
3Commitment to General Reviews – By Architect and Engineers Form – Structural, Shoring, Vibration
4Vibration Control Declaration Form, including zone of influence report, pre-construction survey and monitoring program
5Vibration Control and Zone of Influence plan/drawing
6Municipal Road Damage Deposit Form is required for the intake of Building applications for new buildings; the requirement for payment is waived if Site Plan approval is required

Plans and drawings

7Shoring Drawings
8Architectural Drawings (as required for information)
9Structural Drawings (as required for information)
10Construction Details and Notes
11Property Survey (R-Plan)
12Pre-Construction Survey
13Zone of Influence Drawings

Technical supporting information

14Geotechnical Engineering Report
15Geotechnical Instrumentation and Monitoring Plan (GIMP) Report
16Preliminary Construction Impact Assessment Report
17Construction Noise & Vibration Monitoring Plan
18Construction Noise & Vibration Assessment Report
19Property Owner Consent: Private Property Tie-back Agreements or Authorizations (as required for tie-backs into adjacent private properties)
20Property Owner Consent: Tie-back & Piling Agreement with City Transportation Services (as required for tie-backs within the ROW)

Notes

21Fees. Note: upon submitting all the required forms and documents, the City will send a submission status letter, indicating any deficiencies or, if complete, providing the required fees.
22A Part Permit Application must contain the Main Building Permit Folder number.
23A Part Permit can only be submitted once the main Building permit has been submitted and accepted. The Main Building Permit (BLD) must be submitted and, if not fully completed, the Building Division Director will provide approval to proceed with the acceptable percentage of completed documentation.
24Engage with Toronto Water for a Dewatering Sewer Discharge Agreement at early stages of design and prior to Building Permit Application. Toronto Building will require Toronto Water confirmation that they have no objections to Toronto Building issuing the CP permit with a dewatering discharge clause.
25This Permit Application Checklist should be read in conjunction with the Permit Application Checklist – General Notes.

Submission requirements for building permit application are governed by Article 3 of Toronto Municipal Code, Chapter 363. This checklist identifies the scope of information typically required to support processing of this type of application in accordance with Chapter 363. Nevertheless, it is the responsibility of the applicant to consult with the approval authority prior to application submission to confirm the submission requirements for more complex applications. This checklist is not intended to be exhaustive. Other information necessary for the complete review of the building permit submission may be required by the Chief Building Official and in accordance with § 363.

Permits this checklist is for