Interior Alteration (Non-Residential) Permit
City of Toronto: Toronto Building · version June 1, 2021, Rev. 1
Cover letter including
| 1 | Brief description of proposed work |
| 1 | Contents of the submission |
Application forms
| 2 | Application For a Permit to Construct or Demolish Form |
| 3 | Ontario Building Code Supplementary Standard SB-10 Project Information |
| 4 | Commitment to General Reviews By Architect and Engineers Form |
| 5 | Existing Life Safety Systems for Building Application Form (required if the OBC Matrix is not included as part of the drawings; see item 20) |
Plans and drawings (types of documents that may be required depending on the scope of the interior alteration; consultation with Toronto Building is recommended)
| 7 | Architectural Drawings including: |
| 8 | Context Plan |
| 9 | Site Plans Drawing, including:
|
| 16 | Floor Plans Drawings |
| 17 | Roof Plans Drawings |
| 18 | Elevations Drawings |
| 19 | Sections Drawings |
| 20 | Ontario Building Code Information and Matrix |
| 21 | Site Servicing Plan (if applicable) |
| 22 | Structural Drawings |
| 23 | Electrical Drawings |
| 24 | Mechanical Drawings |
| 25 | Construction Details and Notes Drawings |
| 26 | Sprinkler Layout Plan |
Technical supporting information
| 27 | Construction details and notes:
|
| 28 | Building life safety: information about the life safety system in the building. The Building Design Information Form, Existing Life Safety Systems form or an OBC Matrix may be used to show this information. |
Notes
| 29 | Fees. Upon submitting all the required forms and documents, the City sends a submission status letter indicating any deficiencies or, if complete, the required fees. All fees must be paid before the application is processed and review commences. |
| 30 | This Permit Application Checklist should be read in conjunction with the Permit Application Checklist – General Notes. |
Submission requirements for building permit application are governed by Article 3 of Toronto Municipal Code, Chapter 363. This checklist identifies the scope of information typically required to support processing of this type of application in accordance with Chapter 363. Nevertheless, it is the responsibility of the applicant to consult with the approval authority prior to application submission to confirm the submission requirements for more complex applications. This checklist is not intended to be exhaustive. Other information necessary for the complete review of the building permit submission may be required by the Chief Building Official and in accordance with § 363.
Permits this checklist is for