Submission checklists › MECP
Permit to Take Water (PTTW)
Ontario Ministry of the Environment, Conservation and Parks (MECP) · version May 31, 2021, Rev. 1
Cover letter / memo (signed) including
| 1 | Description of the proposed work, including the reason for the application and a list of the documentation attached |
Application form
| 2 | MECP Permit to Take Water Application:
|
| 3 | Review and administrative fee, payable to "Ontario Minister of Finance" by certified cheque, bank draft or money order in Canadian funds. Include purchaser's name and address. Payment may also be made by Visa, MasterCard or American Express. |
| 4 | Part 8: Public Consultation / Environmental Bill of Rights requirements. This section asks two questions that determine whether the application may be subject to posting and/or public consultation under the Environmental Bill of Rights; examine it ahead of time to determine if any actions are required before submission. |
Administrative documentation
| 5 | Consent of property owner:
|
| 6 | If the proposed works cross railway rights-of-way or TTC tracks and/or are in TRCA lands, easements and/or within 300 m of a live railway, etc., provide evidence that notification and/or approval has been sought or granted, with backup documentation. |
| 7 | Copy of the Easement Agreement, if executed, and the associated Registered Plan. All applicable easements must be labelled on all drawings. |
| 8 | Proof of legal name and signing authority if the Proponent is a corporation: proof of legal name (e.g. Articles of Incorporation filed under the Corporations Information Act or the most current business registration under the Business Names Act, 1990) and a letter indicating proof of signing authority. |
| 9 | Minister's Notice of Environmental Project Report: provide a copy of the letter from MECP. |
| 10 | Complaints resulting from the water taking location: indicate whether you are aware of any complaints that have resulted from the taking of water at the location (e.g. interference with neighbouring wells, or downstream water use interference). |
| 11 | Pre-submission meeting minutes (if applicable), especially in atypical cases (such as the ministry accepting a Category 1 application for a Category 3 project) |
Drawings
| 12 | Map indicating the location of the proposed water taking(s) on a detailed topographic map. In southern Ontario use the Ontario Base Map (OBM) 1:10,000 scale series; in northern Ontario the OBM 1:10,000 or 1:20,000 maps for the area. Outline the property of intended water taking and mark and label: (i) all existing and proposed water taking locations with names of sources; (ii) all designated features within 500 m of the water taking location (see form). |
Technical / supporting information
| 13 | Source location information (Category 1, 2 and 3). For more than one taking location, copy the Source Information section (pages 3–4 of the form) for each additional site.
|
| 14 | Water in containers (Category 1, 2 and 3): indicate whether water is placed in containers at the site or incorporated into a product. The Water Taking Regulation (O. Reg. 387/04) limits transfers out of a water basin; if taking water for containerization, review the regulation or contact the Ministry's regional office. |
| 15 | Well location and municipal water availability (Category 1, 2 and 3): distance to the nearest well and whether municipal water is available within 500 m of the water taking location. |
| 16 | Description of operations (Category 1, 2 and 3): describe in detail how, where and when all water is obtained, stored, transferred, used and returned to the environment (if applicable), including the source of all water takings (and source name), purpose, period of water taking and maximum quantity requested. If the application is posted on the EBR Registry, this description is used for the Proposal Notice (the ministry may change the wording). |
| 17 | Water taking needs (Category 1, 2 and 3): describe how water taking needs (rates, amounts and time periods) were determined, with all relevant information and calculations demonstrating the requested takings are warranted. |
| 18 | Scientific Evaluation (Category 2): completed by a Qualified Person and attached to all Category 2 applications (Schedule 2 – Qualified Person Certification for Category 2 Groundwater Takings, or Schedule 3 – for Category 2 Surface Water Takings). |
| 19 | Scientific Study Report (Category 3, hydrogeological and/or hydroecological study): completed by a Qualified Person for Category 3 applications (see the Technical Guide to Hydrogeological Studies to support Category 3 applications). |
| 20 | Environmental Assessment (EA) or TPAP: provide proof of public consultation |
Notes
| 21 | Categories of proposals for Permits to Take Water: proposals are classified by their anticipated risk to the environment; the greater the risk, the more evaluation required. Three categories are explained in the Guide to the Permit to Take Water application form. |
| 22 | Niagara Escarpment Planning and Development Act: you may need proof of a Niagara Escarpment Development Permit or similar approval. A project subject to the Act without a development permit cannot be approved under the Ontario Water Resources Act. Contact the Niagara Escarpment Commission (905-877-5191, escarpment.org). |
| 23 | Oak Ridges Moraine Conservation Act: check whether your water source is within the Oak Ridges Moraine Conservation Area using the maps at ontario.ca/page/oak-ridges-moraine (or request publication 5461 from the Ministry Public Information Centre, 1-800-565-4923). |
This checklist identifies the scope of information typically required to support processing of an application. It is the responsibility of the applicant to consult with the approval authority prior to application submission to confirm the submission requirements for more complex or atypical applications.
Permits this checklist is for
Official pages
- Guide to the PTTW application form
- Qualified Person certification (Cat. 2 groundwater)
- Qualified Person certification (Cat. 2 surface water)
- Hydrogeological studies for Category 3
Track this submission free.
Track this permit freeDeadlines in business days, email alerts before decisions are due, and your whole team in one place.